Sattva Ashraya

Bengaluru - Mysuru Expressway, Bidadi
RERA No. PRM/KA/RERA/1270/302/PR/210731/004204

overview

The pathway to a hassle-free life

Stretching over 4.2 acres, Sattva Ashraya comprises 4 well-planned towers with 660 elegantly designed, spacious homes. Located in the thriving neighborhood of Bidadi, Karnataka, the property is situated on the Bengaluru-Mysuru Highway. It is also well-connected to 10 Lane Bengaluru – Mysuru Expressway for easy accessibility.

 

LOCATION HIGHLIGHTS

Find every convenience just a stone’s throw away

Located in the smart city of Bidadi, Ashraya offers utmost convenience and ease. Situated on the Bengaluru-Mysuru Highway, find the best of entertainment, shopping, schools, and hospitals in close proximity to home. Here are some of the landmark destinations you can’t miss:

location

Ideally located on Bidadi Bengaluru-Mysore Highway

Coca Cola Depot—900 Mtrs

Wonderla Amusement Park—3.5 Kms

Eagleton – The Golf Resort—3.6 Kms

Hejjala Railway Station—4 Kms

Bidadi Railway Station—4 Kms

Christ University Kengeri Campus—7 Kms

Raja Rajeswari College of Engineering & Medical—8.3 Kms

PLAN

Designed with a contemporary style of architecture for the urban landscape and fortified by the group’s age-old values of trust, these futuristic homes are built for you to grow old in. Bathed in ample sunlight and washed by greenery, this is fine-living at its best.

MASTER PLAN TOWER PLAN

  • 1. Entry/Exit
  • 2. ENTRANCE PLAZA
  • 3. SECURITY CABIN
  • 4. DRIVEWAY
  • 5. PATHWAY JOGGING TRACK
  • 6. OUTDOOR CAR PARKING
  • 7. LOBBY DROP OFF AREA
  • 8. PEDESTRAIN NODE
  • 9. RAMP EXIT FROM BASEMENT
  • 10. RAMP ENTRY TO BASEMENT

AMENITIES

  • 11. OUTDOOR GYM / TREE PLAZA
  • 12. MULTI PURPOSE COURT
  • 13. MAIN SWIMMING POOL
  • 14. SENIOR CITIZEN SPACES Court
  • 15. LEISURE SEATING SPACES
  • 16. REFLEXOLOGY WALKWAY
  • 17. CHILDREN’S PLAY AREA
  • 18. SKATING RINK
  • 19. KID’S POOL
  • 20. SERVICES

Specifications

The Group’s renowned processes and practices have set the bar high in the development industry. Our buildings welcome you with the warmth and safety that you have promised your family.

R.C.C Framed Structure with Porotherm / Cement Block Walls.
Vitrified flooring, Cement Finish, Anti-skid Ceramic Tiles, Vitrified Tiles
• Chromium plated fittings for all toilets • Wall mixer with shower in bath area • Health Faucet for all the Toilets. • Floor Mounted EWC for all Toilets • Wash Basin / Corner Wash basins
No kitchen counter, sink & sink mixer shall be provided. (to be installed by end user). • Inlet & Outlet Provision for washing machine.
Electrical Provision for geysers in all the toilets.
All Door Frames of RCC. All Door Shutters- flush shutters with paint finish and necessary hardware.
Aluminium / UPVC sliding door with mosquito mesh in Living room. • Aluminium / UPVC windows with mosquito mesh (Living/Dining, & all bedrooms). • Aluminium/UPVC Ventilators for Toilets. • Balcony Railings in MS.
• Exterior Walls with weather coat paint as per design. • Internal Walls and ceilings with oil bound distemper. • Enamel paint on all MS railings/ grills.
• Automatic passenger lifts.
• One TV Point in living room • Only conduiting for Telephone point in Living room i.e. without wiring and switch box. • Only conduiting for AC in Master bedroom shall be provided (AC point not in developer scope). • Intercom facility in ground floor of each tower to the security room. • Individual apartments to have a BESCOM power of 2 kW for 1BHK and 3 kW for 2 BHK & 3 BHK.
• 0.25 KVA for 1 BHK, 2 BHK and 3 BHK.

Amenities

Indoor Amenities

  • Clubhouse
  • Multi-purpose Hall
  • Yoga Studio
  • Gym
  • Shuttle Court Auditorium
  • Library

outdoor Amenities

  • Skating RInk
  • Children’s Play Area
  • Outdoor Gym
  • Half Basketball Court

PROJECT PROGRESS

Progress As On

January 1, 2023

+

Progress As On

December 1, 2022

+

Progress As On

November 1, 2022

+

Progress As On

October 1, 2022

+

Progress As On

September 1, 2022

+

Progress As On

August 1, 2022

+

Progress As On

July 1, 2022

+

Progress As On

June 1, 2022

+

Progress As On

May 1, 2022

+

Progress As On

April 1, 2022

+

Progress As On

March 1, 2022

+

CONTACT US